Combined Synopsis/SolicitationActiveRFP27-005JR
RF Roof Replacement Project
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / PRINCETON LAB - DOE CONTRACTORKey dates?
- Posted?
- Nov 2, 2026
- Response deadline?
- Dec 10, 2026, 9:00 PM UTC
- Archive date?
- Dec 25, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- No Set aside used
- Set-aside code?
- NONE
- PSC?
- Y1EZ
NAICS?
- 238160Roofing Contractors
Issuing office?
- Department?
- ENERGY, DEPARTMENT OF
- Sub-tier?
- ENERGY, DEPARTMENT OF
- Office?
- PRINCETON LAB - DOE CONTRACTOR
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- Princeton, NJ, 08540, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Princeton
- State?
- NJ
- Zip?
- 08543
- Country?
- USA
Contacts?
- JIMMY RUSSELLprimary
Description?
The Princeton Plasmas Physics Laboratory is seeking a qualified contractor to replace roofing on two existing roofs. The (C40 RF Building & C41 CS Building) which are past their useful life requiring costly maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures, and flashing. Portions of existing metal coping have pulled away during storm events causing large sections of membrane to separate from the substrate. A catastrophic failure to one of these roofs would negatively impact the ability to conduct the top priority experimental operations in the Laboratory. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise required to replace the noted roofs and specified components per the associated contractdesign documents. Construction scope includes the following: Remove and replace existing built-up roofs at PPPL. Buildings include: a. C40 – RF Building b. C41 – CS Building All work shall be perfomed IAW SOW titled: C40 & C41 RF ROOF REPLACEMENT CONSTRUCTION dated 28 Aug 2026 Only some of the solicitation documents have been posted. The remaining documents will be released to offerors (on an as requested basis) when we receive the following information and documents (1) An e-mail confirmation of your intent to participate in the site visit/pre-bid meeting scheduled for 11/17/26 (2) A signed solicitation acknowledgement form (3) Identification of your lead proposal manager for this solictation via e-mail (4) A written request for project drawings (see attached form) The link to complete your Princeton supplier registration is referenced below:: https://finance.princeton.edu/special-information/suppliers-and-payees/information-suppliers/become-princeton-supplier
Other notices in this solicitation?
- Combined Synopsis/SolicitationRF Roof Replacement ProjectNov 9, 2026LATEST
- Combined Synopsis/SolicitationRF Roof Replacement ProjectNov 5, 2026LATEST
- Combined Synopsis/SolicitationRF Roof Replacement ProjectNov 2, 2026LATEST
- Combined Synopsis/SolicitationRF Roof Replacement ProjectNov 2, 2026LATEST
- Combined Synopsis/SolicitationRF Roof Replacement ProjectOct 30, 2026
Similar open contracts
Metadata?
- Notice ID?
- 2aab2f5afecd465db78e16f59f83da0b
- Full path?
- ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.PRINCETON LAB - DOE CONTRACTOR
- Office code?
- —
- Ingested?
- Nov 11, 2026
- Updated?
- Nov 11, 2026