This notice has been superseded. See the latest notice: SLAC Sector 30 Erosion Mitigation Project (Sources Sought)
Sources SoughtActiveSLAC_RFP_365203
SLAC Sector 30 Erosion Mitigation Project
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / SLAC Natl Accel Lab -DOE ContractorKey dates?
- Posted?
- Jun 13, 2026
- Response deadline?
- Jun 19, 2026, 12:00 AM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Sources Sought
- Base type?
- Sources Sought
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- —
NAICS?
Issuing office?
- Department?
- ENERGY, DEPARTMENT OF
- Sub-tier?
- ENERGY, DEPARTMENT OF
- Office?
- SLAC Natl Accel Lab -DOE Contractor
- Office code?
- 089.8900.899040
- Organization type?
- OFFICE
- Office address?
- Menlo Park, CA, 94025, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Menlo Park
- State?
- California
- Zip?
- 94025
- Country?
- UNITED STATES
Contacts?
- Quyen Wengprimary
Description?
DESCRIPTION This is a Sources Sought Notice to identify consultants to provide necessary construction work to mitigate soil erosion in an area referred to as Sector 30. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice. PLANNED SCOPE AND DESCRIPTION OF SERVICES SLAC is seeking a qualified general contractor to perform construction work to mitigate soil erosion in an area referred to as Sector 30. This project aims to remove and replace the current failed pavement, slope, earthwork, and storm drain and install permanent vegetation and erosion control measures. Site visits were performed on April 22, 2025 and January 15, 2026 to review the existing conditions. The project area includes an approximately 12- to 13-foot-tall hillside slope, sloping downward from north to south, with a slope gradient ranging from approximately 1:1 to 4:1 (horizontal: vertical). The erosion area is next to a sediment basin structure 30F-7 that flows into catch basin 30F-11. The asphalt concrete pavement is approximately 285.5 feet in elevation and slopes down approximately 13 feet to the catch basin. The full list of requirements can be found in the Statement of Work, IFC Drawing Package, and Project Specifications. SOURCES SOUGHT RESPONSE Interested firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information: Firm’s name Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PST on June 18th, 2026. SOURCES SOUGHT DISCLAIMER: Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
Attachments (26)?
- Download📎 DRAFT_B2_10.1_Section_L_SLAC_Question%26Answer_Log_%28RFI%29.pdfapplication/pdf · 553 KB
- Download📎 DRAFT_B2_08.07_Final_Inspection_Report.pdfapplication/pdf · 701 KB
- Download📎 DRAFT_B2_01_Section_A_%28Subcontract_Form%29.pdfapplication/pdf · 645 KB
- Download📎 DRAFT_B2_08.08_Construction_Subcontracts_Final_Release.pdfapplication/pdf · 795 KB
- Download📎 DRAFT_B2_02_Section_B_%28Supplies_or_Services_and_Price_Costs%29.pdfapplication/pdf · 568 KB
- Download📎 DRAFT_B2_00_Cover_Letter.pdfapplication/pdf · 607 KB
- Download📎 DRAFT_B2_08.01_DBA_WD_CA20250018_18MAY2026_Mod_05.pdfapplication/pdf · 4.1 MB
- Download📎 DRAFT_B2_10.0_Section_L_Instructions_to_Offerors_Sector_30_Erosion_Mitigation.pdfapplication/pdf · 770 KB
- Download📎 DRAFT_B2_03.3_NEPA_env_compliance_checklist_Sect_30.pdfapplication/pdf · 956 KB
- Download📎 DRAFT_B2_06_Section_H_%28Special+TsCs%29.pdfapplication/pdf · 608 KB
- Download📎 DRAFT_B2_08.06_NTP_Submittal_Checklist_061424.pdfapplication/pdf · 1.1 MB
- Download📎 DRAFT_B2_09.0_Section_K_%28Rep_and_Certs%29.pdfapplication/pdf · 616 KB
- Download📎 DRAFT_B2_08.03_Work_Classification_Form_365203.pdfapplication/pdf · 11.4 MB
- Download📎 DRAFT_B2_07_Section_I_%28Specific_Subcontract_Clauses%29.pdfapplication/pdf · 586 KB
- Download📎 DRAFT_B2_08.05_SubcontractorFormSQF.pdfapplication/pdf · 776 KB
- Download📎 DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdfapplication/pdf · 661 KB
- Download📎 DRAFT_B2_03.1_SOW_Sector_30_Erosion_Mitigation.pdfapplication/pdf · 1.2 MB
- Download📎 DRAFT_B2_03.0_Section_C_%28Specifications_SOW%29.pdfapplication/pdf · 587 KB
- Download📎 DRAFT_B2_08.02_Subcontractor_Safety_IIPP.pdfapplication/pdf · 618 KB
- Download📎 DRAFT_B2_05.0_Section_G_%28General_TsCs%29.pdfapplication/pdf · 620 KB
- Download📎 DRAFT_B2_11_Section_M_Evaluation_Factors_Sector_30_Erosion_Mitigation.pdfapplication/pdf · 689 KB
- Download📎 DRAFT_B2_08.04_SF1413.pdfapplication/pdf · 638 KB
- Download📎 DRAFT_B2_03.2_SLAC_Drawings_S30_Plans.pdfapplication/pdf · 9.8 MB
- Download📎 DRAFT_B2_08.0_Section_J_%28List_of_Attachments%29.pdfapplication/pdf · 593 KB
- Download📎 DRAFT_B2_04_Section_F_%28Deliveries_Performance%29.pdfapplication/pdf · 584 KB
- Download📎 DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdfapplication/pdf · 975 KB
Other notices in this solicitation?
- Sources SoughtSLAC Sector 30 Erosion Mitigation ProjectJun 12, 2026LATEST
Similar open contracts
Metadata?
- Notice ID?
- 20c87a9aca3949beb610573b3d930cf9
- Full path?
- ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.SLAC Natl Accel Lab -DOE Contractor
- Office code?
- 089.8900.899040
- Ingested?
- Jun 13, 2026
- Updated?
- Jul 4, 2026