Sources SoughtActive89243327NEX000003
66--IRA - High-Temperature Chamber Furnace
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / NATIONAL ENERGY TECHNOLOGY LABORATORYKey dates?
- Posted?
- Nov 10, 2026
- Response deadline?
- Nov 16, 2026, 6:00 PM UTC
- Archive date?
- Dec 1, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Sources Sought
- Base type?
- Sources Sought
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- 6640
NAICS?
Issuing office?
- Department?
- ENERGY, DEPARTMENT OF
- Sub-tier?
- ENERGY, DEPARTMENT OF
- Office?
- NATIONAL ENERGY TECHNOLOGY LABORATORY
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- MORGANTOWN, WV, 26507, USA
Contacts?
- Lahey, David J.primary
Description?
This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
Other notices in this solicitation?
- Sources Sought66--IRA - High-Temperature Chamber FurnaceNov 5, 2026LATEST
Similar open contracts
Metadata?
- Notice ID?
- 1c49db41c3ed48d8a2b515db088a9727
- Full path?
- ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.NATIONAL ENERGY TECHNOLOGY LABORATORY
- Office code?
- —
- Ingested?
- Nov 11, 2026
- Updated?
- Nov 11, 2026