Combined Synopsis/SolicitationActiveW911S226U3076
Griddles
DEPT OF DEFENSE / DEPT OF THE ARMY / W6QM MICC-FT DRUMKey dates?
- Posted?
- Apr 21, 2026
- Response deadline?
- May 1, 2026, 5:00 PM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- 3605
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- W6QM MICC-FT DRUM
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- FORT DRUM, NY, 13602-5220, USA
Place of performance?
- Street?
- West Point
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- 10996
- Country?
- —
Contacts?
- Jason Lewisprimary
Description?
Heavy duty gas griddle, stainless steel front, sides and front top ledge. Fully welded stainless and aluminized steel body frame. 11 Inch low profile cooking height on 6 Inch legs.1 Inch thick polished steel griddle plate with 12-gauge, 4 Inch stainless steel back and tapered side splashes. 72 Inch W 31-1/2 Inch D 15-1/4 Inch H 6 Burners, 162,000BTU, 2 Drawers ? Fully welded stainless and aluminized steel chassis frame ? 11 Inch low profile cooking height on 4 Inch adjustable legs ? 1 Inch thick polished steel griddle plate with 12 gage, 10 Inch stainless steel back and tapered side splashes ? Spatula wide 3-1/2 Inch grease gutter and chute are fully welded for easier cleaning and to stop grease migration ? One 27,000 BTU/hr. U shaped aluminized steel burner for every 12 Inch of griddle width ? One embedded snap action thermostat per burner with temperature adjust from 200 Degree F to 550 Degree F on Steel or Chrome plate; temperature adjusts from200 Degree F to 450 Degree F on Rapid Recovery plate ? Large 6-quart stainless steel grease drawer (2 drawers on 60 Inch and 72 Inch models) ? Heavy duty chromed thermostat knob guards ? One pilot safety valve for every two burners; safety will completely shut off gas to pilot and burners if pilot extinguishes ? Manual ignition ? Bottom heat shields ? ? Inch rear gas connection and gas pressure regulator supplied with the unit must be installed ? Natural Gas 4.0 Inch 3/4 rear gas connection. 4 each: HOSE ? Inch x 4Ft long gas flex hose, and quick disconnect 4 each: Equipment Stand (STAND/C-72SA72)Universal equipment stand 24 Inch H, 1/2 Inch marine edge, undershelf, stainless steel, 5Inch casters 3 each: BANKING STRIP Griddle Banking Strips ? Deliver equipment with4eachall power and water lines for installation to existing supply lines. ? Unpack and install/connect/assemble new equipment and water filter system to existing supply lines and remove/discard all rubbish with installer. ? Once installed/connected, test equipment is fully operational in the presence of POC prior to departing the facility Standard Parts and Warranty
Similar open contracts
Metadata?
- Notice ID?
- 13d40e9ac5be49a08155f5c12a2dc607
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.W6QM MICC-FT DRUM
- Office code?
- —
- Ingested?
- May 2, 2026
- Updated?
- Jul 11, 2026