LK CONSTRUCTION CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SI
UEI G24AKBSFM4X3 · 4 awards · $2,398,002 total
- Repair of the Failing Victory Field, Camp HenryDEPT OF DEFENSE / DEPT OF THE ARMYW91QVN24D0081$983,319—
- Repair South Loop TaxiwayDEPT OF DEFENSE / DEPT OF THE ARMYW91QVN24D0084NAICS 488119$1,360,078—
- Electrical Main Panel Consolidation B127, Camp Carroll (Work Plan)DEPT OF DEFENSE / DEPT OF THE ARMYW91QVN24D0081$30,688—
- Repair the Generator for Tower 3 B820, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMYW91QVN24D0081$23,917—