GovBidAlerts

Alaska DOT&PF government contracts, bids & RFPs

State / local / other government buyer · 129 open bids

Open government contracts, bids and RFPs from Alaska DOT&PF, the vendors it awards most, and the industries it buys — aggregated from public procurement data and updated daily.

Match your business

Paste your website — we'll show the open government contracts that fit your business.

Free · no signup · we read your homepage once. We don't store your email.

Alaska DOT&PF contract activity

A current snapshot based on 20 of 129 open listings shown on this page. Counts update with the directory.

Listings shown by source
  • Alaska DOT&PF20

Deadline outlook

Next 30 days
12
Later
8
Open / rolling
0

Most represented buyers

  1. Alaska DOT&PF20

0 of the listings shown were posted in the last 30 days. Alaska DOT&PF contributes the largest share (20). Alaska DOT&PF is the most represented buyer in this snapshot.

Open opportunities

  • ANCHORAGE AREA DRAINAGE PRESERVATION
    Alaska DOT&PF

    This is a child project of CFHWY00851 Anchorage Area Pavement Preservation Group A. This project will address the significant number of deteriorating and damaged storm drain systems within the Group A limits through rehabilitation using trenchless construction methods.

    More
    Due Oct 31, 2026
    Posted —
  • FAST Area Surface Upgrades FFY2026
    Alaska DOT&PF

    Perform pavement resurfacing, replace pavement markings, replace sidewalk curb with Americans with Disabilities Act (ADA) compliant curb ramps at street corners, improve sidewalks and pedestiran facilities, improve intersections, and install cross culverts on various streets and sidewalks in Fairbanks and North Pole.

    More
    Due Oct 31, 2026
    Posted —
  • STERLING HIGHWAY MP 43-56 PAVEMENT PRESERVATION
    Alaska DOT&PF

    Pavement preservation, which may include improvements to roadside hardware, drainage, intersections, automated traffic recorders, pedestrian facilities, bridge work, striping, and utilities.

    More
    Due Oct 31, 2026
    Posted —
  • Palmer-Fishhook Road MP 7-17 Pavement Preservation
    Alaska DOT&PF

    Pavement Preservation of Palmer-Fishhook Road Mileposts 7-17 and may include, as necessary: Bridge Work, Roadside Hardware, Drainage Improvements, and Utilities.

    More
    Due Oct 31, 2026
    Posted —
  • ANC North Terminal Ops Expansion
    Alaska DOT&PF

    This state-funded project will provide improvements and updates to the Airport Operations section at Ted Stevens Anchorage International Airport, including new flooring, finishes, renovated break area, and restrooms. The contract includes one (1) additive alternate for removal of a wall separating two rooms, including associated modifications to the sprinkler system, ductwork, thermostat, and other mechanical and electrical items.

    More
    Due Oct 31, 2026
    Posted —
  • KENAI SPUR HIGHWAY MP 29-38 PAVEMENT PRESERVATION
    Alaska DOT&PF

    This project will resurface the Kenai Spur Highway between mileposts 29 and 38. Improvements to roadside hardware, safety, drainage, signs, and minor structural section improvements may also be included.

    More
    Due Oct 31, 2026
    Posted —
  • AMATS: NORTHERN LIGHTS BLVD SIDEWALK REPAIRS - PHASE 1
    Alaska DOT&PF

    This is a child project/first phase of parent project CFHWY00713 AMATS: Northern Lights Boulevard Sidewalk Repairs. This phase focuses on improvements to the south side of Northern Lights Boulevard between Minnesota Drive and the Seward Highway, including pedestrian facility upgrades and ADA improvements where needed.

    More
    Due Oct 31, 2026
    Posted —
  • HSIP: TUDOR RD: BAXTER RD TO PATTERSON ST CHANNELIZATION
    Alaska DOT&PF

    Install a non-traversable median and roadside barriers on Tudor Road between Baxter Road and Patterson Street. The proposed median targets head-on and access-related crashes by providing physical separation between vehicles, identifying specific left turn locations, and promoting through trips. This median may be raised concrete curb, concrete barrier, or a combination of both median types.

    More
    Due Oct 31, 2026
    Posted —
  • Ketchikan Ferry Terminal Mechanical and Electrical Improvements
    Alaska DOT&PF

    This project encompasses upgrades to electrical, mechanical, hydraulic, and civil infrastructure at Berths 1,2, and 3 at Ketchikan Ferry Terminal, Ketchikan, Alaska.

    More
    Due Oct 31, 2026
    Posted —
  • ANC Gates B1, B3, and B5 Rehabilitation
    Alaska DOT&PF

    Rehabilitate and extend the useful life of aprons B1, B3, and B5 to include joint seal replacement, concrete rehabilitation and striping.

    More
    Due Nov 16, 2026
    Posted —
  • FAIRVIEW LOOP ROAD REHABILITATION AND PATHWAY - STAGE I
    Alaska DOT&PF

    Construct safety improvements on Fairview Loop between Sue Lane and South Valley Loop and Alder Lane and South Bearing Tree Lane. Work includes reconstruction, widening, drainage improvements, utilities, and roadside hardware.

    More
    Due Nov 20, 2026
    Posted —
  • Fairview Loop Pathway and Safety Improvements (GF/GO)
    Alaska DOT&PF

    This project will construct a separated pathway along Fairview Loop Road from Top of the World Circle to Edlund Road. Construction of the pathway may be extended further east depending on the available funding. Safety improvements at selected intersections and drainage improvements not included the Fairview Loop Pavement Preservation project will also be included in the project. The 2025 construction work package will consist of replacing the Cottonwood Creek and Cottonwood Slough culverts on…

    More
    Due Nov 20, 2026
    Posted —
  • GLENN HWY AND OLD GLENN HWY EROSION PROTECTION PHASE 1
    Alaska DOT&PF

    This is a child project of CFHWY01252. This project will repair damage to the Old Glenn Highway and Glenn Highway resulting from riverine erosion and incorporate protective measures to minimize the possibility and the rate of further erosion damage to transportation infrastructure. The erosion is related to the Matanuska River and tributaries and will also address any other causes of erosion at or near these sites.

    More
    Due Nov 30, 2026
    Posted —
  • PSG AREAWIDE CHIP SEAL
    Alaska DOT&PF

    This project will design and construct a chip seal overlay on all areawide roads in Petersburg. Additional work includes crushed asphalt base course (CABC), striping & signs.

    More
    Due Nov 30, 2026
    Posted —
  • Seppala Drive Upgrade
    Alaska DOT&PF

    Realign and rehabilitate Seppala Drive in Nome. Work includes pavement rehabilitation, roadside hardware, drainage improvements, intersection improvements, ADA improvements, and utilities.

    More
    Due Nov 30, 2026
    Posted —
  • STATEWIDE BRIDGE NAVIGATIONAL LIGHT IMPROVEMENTS
    Alaska DOT&PF

    The proposed project will replace existing aviation obstruction lighting and marine navigation lighting for bridges in Juneau, Sitka, Kodiak, Dutch Harbor, & Kotzebue with new LED lighting.

    More
    Due Nov 30, 2026
    Posted —
  • SELDON RD EXT PH II: WINDY BOTTOM/BEVERLY LAKES RD TO PITTMAN RD (MSB)
    Alaska DOT&PF

    This Project will continue the work completed in Phase I of the project and extend Seldon Rd from Windy Bottom.Beverly Lakes Rd to Pittman Rd on new alignment. Work may include: new roadway, approach roads, parking facilities, pedestrian pathway and facilities, drainage improvements, intersection improvements, ADA improvements, roadside hardware, lighting, signing & striping and utilities.

    More
    Due Nov 30, 2026
    Posted —
  • KING SALMON AIRPORT (AKN) SREB
    Alaska DOT&PF

    Construct a multi bay heated snow removal equipment building at King Salmon Airport, removal and rerouting of 1300 lf of perimeter/ security fence and rehabilitation/ of 1700 lf of asphalt roads. This building will serve as warm storage for the airports snow removal equipment to ensure that it is available to clear snow for safe runway operations.

    More
    Due Nov 30, 2026
    Posted —
  • FAST ADA Improvements: Shared-Use Path Improvements: Parks Highway
    Alaska DOT&PF

    Widen and resurface existing shared use path on Parks Highway between Faith Lane and Ester. Re-establish striping that separates the path from the highway. Project will include ADA improvements, drainage improvements, roadside hardware, and utilities.

    More
    Due Nov 30, 2026
    Posted —
  • Fairbanks Youth Facility Safety & Security Modifications Phase Two: Building Wide Improvements
    Alaska DOT&PF

    The Work of this project includes all necessary construction services as required to complete interior renovation and mechanical and electrical upgrades at the Fairbanks Youth Facility building at 1502 Wilbur Street in Fairbanks, Alaska.

    More
    Due Nov 30, 2026
    Posted —

Showing 20 of 129 open bids.

How to win Alaska DOT&PF contracts

  1. Register as a vendor on Alaska DOT&PF's procurement portal.
  2. Match your NAICS / commodity codes to what it buys (see the top codes above).
  3. Ask about local small-business and vendor-preference programs — see set-asides explained.
  4. Monitor its open bids above, or set a GovBidAlerts alert.

New to government contracting? Start with our GovCon guides and glossary.