Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireless broadband service functional (Network Equipment), and maintenance and operation charges, including costs for software needed for the operation of or maintenance of Network Equipment. Network Equipment and maintenance and operation costs for existing networks are eligible. A method to report service outages and receive basic technical support without additional service fees, and a service level agreement. The cost to provide Internet Access (Bandwidth). Bidder's price shall include the following: a. The available bandwidth should be a minimum of 1Gbps. b. The service hand-off shall be directly to the Local Area Network DMARC. c. Construction & Installation- Trenching, boring, plowing. Installation of conduit, handholes, vaults, poles, and fiber cable, splicing, termination, and labeling. d. Testing & Acceptance e. Project Management f. SPI Invoicing Contracts are valid only if E-Rate funding is awarded. To ensure a fair, open, and competitive bidding process and that all vendors receive identical information, all questions, communications, and bid submissions related to this Form 470 must be submitted by email to denise.kenney@imagineschools.org. Telephone inquiries will not be accepted. Bids must be received no later than 5:00 p.m. MST on the Allowable Contract Date (ACD). All vendors must complete and submit the E-Rate Service Provider Bid Response Worksheet with their proposal. Failure to submit the completed worksheet may result in disqualification. There will be no bidders conference, job walk, or product/service demonstrations, either in person or remotely. Vendors must comply with all requirements and specifications contained in the attached RFP and all associated solicitation documents. Failure to comply with any stated requirement may result in disqualification. Quantities identified on FCC Form 470 are estimates only and do not constitute a commitment to purchase or guarantee that any quantity will be awarded. Vendors must not be debarred, suspended, or otherwise prohibited from participating in public procurement. The Applicant reserves the right to reject any bid that does not meet applicable eligibility or procurement requirements. To ensure that all bidders receive the same information and have an equal opportunity to respond, the Applicant will communicate solicitation-related information, including addenda, clarifications, questions and answers, and revisions to the Form 470 or associated bid documents, exclusively through the USAC EPC Portal. Service providers are solely responsible for regularly monitoring the EPC Portal for updates, amendments, clarifications, and other information related to this solicitation. The Applicant will not be responsible for a vendors failure to review or receive information posted in the EPC Portal.
Imagine East Mesa Schools / USA (E-Rate / FCC Form 470)Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireleβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002198Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireless broadband service functional (Network Equipment), and maintenance and operation charges, including costs for software needed for the operation of or maintenance of Network Equipment. Network Equipment and maintenance and operation costs for existing networks are eligible. A method to report service outages and receive basic technical support without additional service fees, and a service level agreement. The cost to provide Internet Access (Bandwidth). Bidder's price shall include the following: a. The available bandwidth should be a minimum of 1Gbps. b. The service hand-off shall be directly to the Local Area Network DMARC. c. Construction & Installation- Trenching, boring, plowing. Installation of conduit, handholes, vaults, poles, and fiber cable, splicing, termination, and labeling. d. Testing & Acceptance e. Project Management f. SPI Invoicing Contracts are valid only if E-Rate funding is awarded. To ensure a fair, open, and competitive bidding process and that all vendors receive identical information, all questions, communications, and bid submissions related to this Form 470 must be submitted by email to denise.kenney@imagineschools.org. Telephone inquiries will not be accepted. Bids must be received no later than 5:00 p.m. MST on the Allowable Contract Date (ACD). All vendors must complete and submit the E-Rate Service Provider Bid Response Worksheet with their proposal. Failure to submit the completed worksheet may result in disqualification. There will be no bidders conference, job walk, or product/service demonstrations, either in person or remotely. Vendors must comply with all requirements and specifications contained in the attached RFP and all associated solicitation documents. Failure to comply with any stated requirement may result in disqualification. Quantities identified on FCC Form 470 are estimates only and do not constitute a commitment to purchase or guarantee that any quantity will be awarded. Vendors must not be debarred, suspended, or otherwise prohibited from participating in public procurement. The Applicant reserves the right to reject any bid that does not meet applicable eligibility or procurement requirements. To ensure that all bidders receive the same information and have an equal opportunity to respond, the Applicant will communicate solicitation-related information, including addenda, clarifications, questions and answers, and revisions to the Form 470 or associated bid documents, exclusively through the USAC EPC Portal. Service providers are solely responsible for regularly monitoring the EPC Portal for updates, amendments, clarifications, and other information related to this solicitation. The Applicant will not be responsible for a vendors failure to review or receive information posted in the EPC Portal.
Imagine Cortez Park Schools / USA (E-Rate / FCC Form 470)Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireleβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002195Seeking bids at multiple bandwidth levels for bundled Internet Access and transport from 50 Mbps to 5 Gbps, where available. Both fiber and non-fiber solutions will be considered. The minimum capacity of 50 Mbps and maximum capacity of 5 Gbps refer to download speeds only. Both symmetrical and asymmetrical Internet services are acceptable. Bidders must specify the download and upload speeds for each proposed bandwidth option. Bids must clearly identify: - Bandwidth level(s) offered. - Method of transport/delivery (fiber, copper, satellite, microwave, or other technology). - Both last-mile and middle-mile transport methods if they differ. - Contention ratio, if applicable, or indicate that the circuit is dedicated. - Any data limits, overage charges, or usage restrictions. - Any leased equipment required to provide the requested service, including make and model. Pricing Requirements Bids must include all applicable fees and charges associated with the proposed service. Pricing must clearly identify and separately itemize, as applicable: - Monthly recurring charges. - One-time/non-recurring charges. - Installation and activation charges. - Equipment or rental charges. - Surcharges and other applicable fees or charges. - Data overage or other usage-based charges. Bids must provide sufficient information for the applicant to determine the total cost of the proposed service. One-year and multi-year pricing will be considered; however, a one-year pricing option must be provided. Month-to-month/noncontracted service proposals will also be considered. Any resulting agreement should be contingent upon the availability of state and/or federal funding and the library's ability to pay. Bid Requirements and Disqualifying Factors To be considered responsive: - The bid must specifically address the services and requirements identified in this FCC Form 470. - The bid must reference this specific FCC Form 470. - The bid must provide a proposed solution responsive to the applicant's specific service requirements. - The bidder must provide complete pricing, including all applicable fees and charges. - The bidder must have a valid SPIN/498 ID. - The bidder must provide discounted billing and invoice USAC using the Service Provider Invoice (SPI) method. - The bid must be received no later than 30 calendar days after the FCC Form 470 is posted. Generic advertisements, flyers, marketing materials, mass-distributed solicitations, generic price lists, SPAM/robobids, automated responses, or other responses that do not specifically address this FCC Form 470 and the applicant's requested services will be considered non-responsive and will be disqualified from consideration. Bids that do not provide complete pricing, including all applicable fees and charges, or that require the applicant to contact the bidder to obtain basic pricing information or determine what service is being proposed will be considered non-responsive and will be disqualified from consideration. Bids received after the stated 30-calendar-day deadline will be disqualified from consideration.
Ninilchik Community Library / USA (E-Rate / FCC Form 470)Seeking bids at multiple bandwidth levels for bundled Internet Access and transport from 50 Mbps to 5 Gbps, where available. Both fiber and non-fiber solutions will be considered. The minimum capacity of 50 Mbps and maximum capacity of 5 Gbps refer to download speeds only. Both symmetrical and asymmetrical Internet services are acceptable. Bidders must specify the download and upload speeds for each proposed bandwidth option. Bids must clearly identify: - Bandwidth level(s) offered. - Method ofβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002026The District is seeking Internet service to support all entities. We are looking for pricing on a 3-year term with two one-year extension options as well as a 5-year term on bandwidth speeds of 5Gbps, 6Gbps, 7Gbps, 8Gbps, 9Gbps, 10Gbps, up to 20Gbps. Please see attached RFP for complete details. The District is seeking Data Transport service to support all entities. We are looking for pricing on a 3-year term with two one-year extension options as well as a 5-year term on bandwidth speeds of 500Mbps, 1Gbps, 2Gbps, 10Gbps, 20Gbps, 40Gbps, up to 100Gbps. Please see attached RFP and Exhibit D Pricing Worksheet for complete details.
San Juan Unified School Dist / USA (E-Rate / FCC Form 470)The District is seeking Internet service to support all entities. We are looking for pricing on a 3-year term with two one-year extension options as well as a 5-year term on bandwidth speeds of 5Gbps, 6Gbps, 7Gbps, 8Gbps, 9Gbps, 10Gbps, up to 20Gbps. Please see attached RFP for complete details. The District is seeking Data Transport service to support all entities. We are looking for pricing on a 3-year term with two one-year extension options as well as a 5-year term on bandwidth speeds of 50β¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002379Addendum #1: BDC07-26/27 - Long Key State Park β Long Key Beach Nourishment and Campground Rebuild
Department of Environmental Protection (DEP) / Florida (MyFloridaMarketPlace)π FLOctober 28, 2026 NOTICE TO APPLICANTS ADDENDUM NO. ONE (1) Long Key - Long Key Beach Nourishment and Campground Rebuild DEP BID NO. BDC07-26/27 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTSHEREIN AND INCLUDE,SIGNED, WITH YOUR BID SUBMISSION. NOTICE Itwill be requiredthat this addendumbe signed in acknowledgment of receipt and that it be included with your Bid when same is submittedto Alisha Sadler,Contracts Specialist, Bureau of Design and Construction, 3800 β¦
Posted Oct 28, 2026Due Nov 19, 2026 (21d)π Florida (MyFloridaMarketPlace)Invitation to BidITB-17335Please see RFP. Please note the mandatory vendor meeting date and time.
Greene County School District / USA (E-Rate / FCC Form 470)Please see RFP. Please note the mandatory vendor meeting date and time.
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002887Bids are sought for a leased lit fiber WAN. Please see the RFP. Questions should be submitted to the URL given in the RFP rather than to a Technical Contact. Bids must include the WAN Pricing spreadsheet. Quotes are also sought for Month to Month service. This is not a redundant request. It is for WAN connectivity in the event the contracted service is not available July 1, 2027.
Montgomery County School Dist / USA (E-Rate / FCC Form 470)Bids are sought for a leased lit fiber WAN. Please see the RFP. Questions should be submitted to the URL given in the RFP rather than to a Technical Contact. Bids must include the WAN Pricing spreadsheet. Quotes are also sought for Month to Month service. This is not a redundant request. It is for WAN connectivity in the event the contracted service is not available July 1, 2027.
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002817We are seeking internet service. Please provide pricing in available increments from the minimum to maximum requested bandwidths (i.e. 1GBps, 2Gbps, 10Gbps... etc.). Installation and/or special construction chareges should be clearly shown on the proposal. If these charges could be added at a later date this must also be noted. Vendors are required to provide separate pricing for all components of a bundled service, and break out the cost of any ineligible products/services. The school will consider a month-to-month service, a multi-year contract or contract with voluntary extensions. All requests for information, questions, and proposals should be sent by email to the technical contact listed below. There are no Services Requested For Category 2
Girls Global Academy Public Charter School / USA (E-Rate / FCC Form 470)We are seeking internet service. Please provide pricing in available increments from the minimum to maximum requested bandwidths (i.e. 1GBps, 2Gbps, 10Gbps... etc.). Installation and/or special construction chareges should be clearly shown on the proposal. If these charges could be added at a later date this must also be noted. Vendors are required to provide separate pricing for all components of a bundled service, and break out the cost of any ineligible products/services. The school will conβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002772- Caddo Parish School District / USA (E-Rate / FCC Form 470)
Caddo Parish School District (BEN 139307) requests competitive proposals for E-Rate Funding Year 2027 Category Two network electronics, associated software and licensing, installation, and eligible maintenance services, as described in RFP 02-27 Network Electronics and its attachments. The District seeks approximately 2,500 wireless access points with associated five-year licensing, approximately 175 48-port PoE network switches with associated network modules, power supplies, stacking componenβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002880 26-0137-7 PURCHASE OF CISCO NETWORK INFRASTRUCTURE EQUIPMENT
Chatham County / Georgia (state)π GAChatham County is soliciting bids from qualified vendors for the purchase of Cisco network infrastructure, wireless networking, data center networking, network accessories, and collaboration equipment. No substitutions will be allowed. Bidders shall provide the exact Cisco products, manufacturer part numbers, licenses, subscriptions, accessories, and support services identified in this ITB. Equivalent, alternate, refurbished, or substitute products will not be accepted. Failure to provide the sβ¦
Posted Oct 28, 2026Due Nov 12, 2026 (14d)π Georgia (state)Non-State AgencyPE-77548-NONST-2027-000000431IFB # 27-003 - UTILITY ABANDONMENT AND SITE RESTORATION AT 3800 GRAHAM PARK ROAD
Town of Dumfries / Virginia (eVA)π VAIFB # 27-003 UTILITY ABANDONMENT AND SITE RESTORATION AT 3800 GRAHAM PARK ROAD
Posted Oct 28, 2026Due Nov 5, 2026 (7d)π Virginia (eVA)IFB130071- Nord Country School / USA (E-Rate / FCC Form 470)
RFP due date is December 2, 2026. The attached RFP outlines all requirements. "MIBS is included only to cover any part of the license or equipment that may qualify only as MIBS.
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002857 MAIN STREET STREETSCAPE IMPROVEMENTS
College Park, City Of / Georgia (state)π GAThe purpose of this project is to improve the condition, safety, and appearance of existing pavement within the project limits. The work will address pavement deterioration, repair damaged areas, improve surface conditions, and extend the service life of existing pavement, enhancing the overall functionality and appearance of the surrounding area.
Posted Oct 28, 2026Due Nov 10, 2026 (12d)π Georgia (state)Non-State AgencyPE-66061-NONST-2027-000000099Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireless broadband service functional (Network Equipment), and maintenance and operation charges, including costs for software needed for the operation of or maintenance of Network Equipment. Network Equipment and maintenance and operation costs for existing networks are eligible. A method to report service outages and receive basic technical support without additional service fees, and a service level agreement. The cost to provide Internet Access (Bandwidth). Bidder's price shall include the following: a. The available bandwidth should be a minimum of 1Gbps. b. The service hand-off shall be directly to the Local Area Network DMARC. c. Construction & Installation- Trenching, boring, plowing. Installation of conduit, handholes, vaults, poles, and fiber cable, splicing, termination, and labeling. d. Testing & Acceptance e. Project Management f. SPI Invoicing Contracts are valid only if E-Rate funding is awarded. To ensure a fair, open, and competitive bidding process and that all vendors receive identical information, all questions, communications, and bid submissions related to this Form 470 must be submitted by email to denise.kenney@imagineschools.org. Telephone inquiries will not be accepted. Bids must be received no later than 5:00 p.m. MST on the Allowable Contract Date (ACD). All vendors must complete and submit the E-Rate Service Provider Bid Response Worksheet with their proposal. Failure to submit the completed worksheet may result in disqualification. There will be no bidders conference, job walk, or product/service demonstrations, either in person or remotely. Vendors must comply with all requirements and specifications contained in the attached RFP and all associated solicitation documents. Failure to comply with any stated requirement may result in disqualification. Quantities identified on FCC Form 470 are estimates only and do not constitute a commitment to purchase or guarantee that any quantity will be awarded. Vendors must not be debarred, suspended, or otherwise prohibited from participating in public procurement. The Applicant reserves the right to reject any bid that does not meet applicable eligibility or procurement requirements. To ensure that all bidders receive the same information and have an equal opportunity to respond, the Applicant will communicate solicitation-related information, including addenda, clarifications, questions and answers, and revisions to the Form 470 or associated bid documents, exclusively through the USAC EPC Portal. Service providers are solely responsible for regularly monitoring the EPC Portal for updates, amendments, clarifications, and other information related to this solicitation. The Applicant will not be responsible for a vendors failure to review or receive information posted in the EPC Portal.
Imagine Charter Elemntary School At Rosefield / USA (E-Rate / FCC Form 470)Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireleβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002201Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireless broadband service functional (Network Equipment), and maintenance and operation charges, including costs for software needed for the operation of or maintenance of Network Equipment. Network Equipment and maintenance and operation costs for existing networks are eligible. A method to report service outages and receive basic technical support without additional service fees, and a service level agreement. The cost to provide Internet Access (Bandwidth). Bidder's price shall include the following: a. The available bandwidth should be a minimum of 1Gbps. b. The service hand-off shall be directly to the Local Area Network DMARC. c. Construction & Installation- Trenching, boring, plowing. Installation of conduit, handholes, vaults, poles, and fiber cable, splicing, termination, and labeling. d. Testing & Acceptance e. Project Management f. SPI Invoicing Contracts are valid only if E-Rate funding is awarded. To ensure a fair, open, and competitive bidding process and that all vendors receive identical information, all questions, communications, and bid submissions related to this Form 470 must be submitted by email to denise.kenney@imagineschools.org. Telephone inquiries will not be accepted. Bids must be received no later than 5:00 p.m. MST on the Allowable Contract Date (ACD). All vendors must complete and submit the E-Rate Service Provider Bid Response Worksheet with their proposal. Failure to submit the completed worksheet may result in disqualification. There will be no bidders conference, job walk, or product/service demonstrations, either in person or remotely. Vendors must comply with all requirements and specifications contained in the attached RFP and all associated solicitation documents. Failure to comply with any stated requirement may result in disqualification. Quantities identified on FCC Form 470 are estimates only and do not constitute a commitment to purchase or guarantee that any quantity will be awarded. Vendors must not be debarred, suspended, or otherwise prohibited from participating in public procurement. The Applicant reserves the right to reject any bid that does not meet applicable eligibility or procurement requirements. To ensure that all bidders receive the same information and have an equal opportunity to respond, the Applicant will communicate solicitation-related information, including addenda, clarifications, questions and answers, and revisions to the Form 470 or associated bid documents, exclusively through the USAC EPC Portal. Service providers are solely responsible for regularly monitoring the EPC Portal for updates, amendments, clarifications, and other information related to this solicitation. The Applicant will not be responsible for a vendors failure to review or receive information posted in the EPC Portal.
Imagine School At Bell Canyon / USA (E-Rate / FCC Form 470)Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireleβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002193Water, Sewer, and Electric SCADA Master Plan
TOWN OF CLAYTON / North Carolina (eVP)π NCDevelopment of a Water, Sewer, and Electric (SCADA) Master Plan
Posted Oct 28, 2026Due Dec 2, 2026 (34d)π North Carolina (eVP)700-2027-WR-03Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireless broadband service functional (Network Equipment), and maintenance and operation charges, including costs for software needed for the operation of or maintenance of Network Equipment. Network Equipment and maintenance and operation costs for existing networks are eligible. A method to report service outages and receive basic technical support without additional service fees, and a service level agreement. The cost to provide Internet Access (Bandwidth). Bidder's price shall include the following: a. The available bandwidth should be a minimum of 1Gbps. b. The service hand-off shall be directly to the Local Area Network DMARC. c. Construction & Installation- Trenching, boring, plowing. Installation of conduit, handholes, vaults, poles, and fiber cable, splicing, termination, and labeling. d. Testing & Acceptance e. Project Management f. SPI Invoicing Contracts are valid only if E-Rate funding is awarded. To ensure a fair, open, and competitive bidding process and that all vendors receive identical information, all questions, communications, and bid submissions related to this Form 470 must be submitted by email to denise.kenney@imagineschools.org. Telephone inquiries will not be accepted. Bids must be received no later than 5:00 p.m. MST on the Allowable Contract Date (ACD). All vendors must complete and submit the E-Rate Service Provider Bid Response Worksheet with their proposal. Failure to submit the completed worksheet may result in disqualification. There will be no bidders conference, job walk, or product/service demonstrations, either in person or remotely. Vendors must comply with all requirements and specifications contained in the attached RFP and all associated solicitation documents. Failure to comply with any stated requirement may result in disqualification. Quantities identified on FCC Form 470 are estimates only and do not constitute a commitment to purchase or guarantee that any quantity will be awarded. Vendors must not be debarred, suspended, or otherwise prohibited from participating in public procurement. The Applicant reserves the right to reject any bid that does not meet applicable eligibility or procurement requirements. To ensure that all bidders receive the same information and have an equal opportunity to respond, the Applicant will communicate solicitation-related information, including addenda, clarifications, questions and answers, and revisions to the Form 470 or associated bid documents, exclusively through the USAC EPC Portal. Service providers are solely responsible for regularly monitoring the EPC Portal for updates, amendments, clarifications, and other information related to this solicitation. The Applicant will not be responsible for a vendors failure to review or receive information posted in the EPC Portal.
Imagine Surprise Schools / USA (E-Rate / FCC Form 470)Pricing should be included for Fiber Ethernet Internet Access [1Gbps-10Gbps] increments from the minimum to the maximum bandwidths noted above. We are seeking [1,3,5] year contract options. [3 or 5 years] contracts should allow for upgrades to quoted bandwidth throughout the terms of the contract. Eligible costs include monthly charges, special construction, installation and activation charges, software, modulating electronics and other equipment necessary to make a Category One wired or wireleβ¦
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002203- Gans Public School / USA (E-Rate / FCC Form 470)
PLEASE SEE THE ATTACHED RFP FOR MORE DETAILS. A. Cost allocate any ineligible charges and/or functionalities. B. Gans School does NOT want installation or configuration. They do not want basic maintenance or mibs. Equipment only. C. All bids must be sent to bidsforerate@yahoo.com on or before 11:59 PM on December 1st, 2026.
Posted Oct 28, 2026Due Nov 25, 2026 (28d)π E-Rate (FCC Form 470)270002876 Greensville Recoating and Repairs to Water Tank 799-10887-1284
DOC - Architecture and Engineering / Virginia (eVA)π VAThe project is generally described as recoating the interior of the existing 0.45MG ground storage water tank, and incidental repairs at Greensville Correctional Center.
Posted Oct 28, 2026Due Nov 4, 2026 (6d)π Virginia (eVA)IFB129431West Linda Multi-Use Basin Phase II Project
Yuba County / Yuba CountyGeneral work description: The work in general consists of constructing parking lot improvements, paving of a multi-use path, ramp to basin, workout & bench areas, storm drain, and landscape improvements at the West Linda Detention Basin located in the West Linda area of Yuba County. Other such items or details not mentioned above that are required by the plans, Standard Specifications, or these Special Provisions, and as directed by the Engineer, shall be performed, placed, constructed or instaβ¦
Posted Oct 28, 2026Due Nov 18, 2026 (21d)π OpenGov (local govts)3260070