Request For Qualifications Construction Manager at Risk Services Sacramento International Airport Pedestrian Walkway from Terminal to Concourse B
saccounty / Airports
Description
The County of Sacramento Department of Airports is seeking a qualified firm, partnership, corporation, association, persons, or professional organizations as construction manager at-risk (“CMAR” or “Firm”) to perform pre-construction and construction services for the Sacramento International Airport Pedestrian Walkway from Terminal to Concourse B The design of the Walkway follows several principles: Increase level of service during planned and unplanned outages of the APM by providing conditioned, ADA compliant circulation Planning for future master plan expansion by adequately sizing the circulation space and structural requirements for Future Concourse C Wayfinding is intuitive and promotes ease of passenger use with or without assistance Constructability of new foundations must be coordinated with existing and proposed infrastructure including the baggage tunnel, existing roadways, and future realignment and expansion of Lindbergh Drive Cohesive architecture and finishing to seamlessly integrate the visual appearance of Terminal B and Concourse B The Department envisions construction to be completed no later than November 2027 or sooner. In general, the selected CMAR delivery method will involve two parts: The provision of preconstruction services, including but not limited to review of the design documents; preparation of cost estimates and reconciliation of estimates prepared by the County’s estimator; value engineering (VE) reviews; constructability/means and methods analysis; and recommendations for design changes. In addition, this phase will require preparation of an overall project schedule, procurement plan, and preparation of cost proposals in the form of a GMP; and Construction of the Walkway, including self-performed construction, construction management, general conditions, and general requirements. The Department will be seeking Federal funding for eligible portions of this project and the actual amount is undetermined.
Details?
- Posted
- Apr 20, 2023
- Response deadline
- Apr 28, 2023, 6:59 AM UTC
- Status
- closed
- Buyer
- saccounty
- Department
- Airports
- Jurisdiction
- saccounty
- Reference #
- 81676
- Summary
- <p>The County of Sacramento Department of Airports is seeking a qualified firm, partnership, corporation, association, persons, or professional organizations as construction manager at-risk (“CM
- Is Paused
- false
- Template Title
- RFx - General Solicitation (for PURB departmental use: upload solicitation documents and required terms/sample contract/forms)
- Copy Count
- 0
- Government Organization City
- Sacramento
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/bd0a409b-2085-409c-af36-57295175e712_SacCountyEbids_logo.png
- Government Organization Name
- County of Sacramento
- Government Organization State
- CA
- Government Organization Website
- https://dgs.saccounty.net/capsd/Pages/default.aspx
- Government Organization Zip Code
- 95827
- Government Organization Address1
- 9660 Ecology Lane
- Government Organization Timezone
- America/Los_Angeles
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Close Out Reason
- RFQ Post-LOI Phase Initiated
- Closed Substatus
- other
Contact
(916)876-6192
Finding similar opportunities…
This listing is a summary from saccounty's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 43845,
"_slug": "saccounty",
"title": "Request For Qualifications Construction Manager at Risk Services Sacramento International Airport Pedestrian Walkway from Terminal to Concourse B",
"status": "closed",
"summary": "<p>The County of Sacramento Department of Airports is seeking a qualified firm, partnership, corporation, association, persons, or professional organizations as construction manager at-risk (“CMAR” or “Firm”) to perform pre-construction and construction services for the Sacramento International Airport Pedestrian Walkway from Terminal to Concourse B </p><p>The design of the Walkway follows several principles:</p><ul><li>Increase level of service during planned and unplanned outages of the APM by providing conditioned, ADA compliant circulation</li><li>Planning for future master plan expansion by adequately sizing the circulation space and structural requirements for Future Concourse C</li><li>Wayfinding is intuitive and promotes ease of passenger use with or without assistance</li><li>Constructability of new foundations must be coordinated with existing and proposed infrastructure including the baggage tunnel, existing roadways, and future realignment and expansion of Lindbergh Drive</li><li>Cohesive architecture and finishing to seamlessly integrate the visual appearance of Terminal B and Concourse B</li></ul><p> </p><p>The Department envisions construction to be completed no later than November 2027 or sooner. In general, the selected CMAR delivery method will involve two parts:</p><ul><li> The provision of preconstruction services, including but not limited to review of the design documents; preparation of cost estimates and reconciliation of estimates prepared by the County’s estimator; value engineering (VE) reviews; constructability/means and methods analysis; and recommendations for design changes. In addition, this phase will require preparation of an overall project schedule, procurement plan, and preparation of cost proposals in the form of a GMP; and</li><li>Construction of the Walkway, including self-performed construction, construction management, general conditions, and general requirements. </li></ul><p>The Department will be seeking Federal funding for eligible portions of this project and the actual amount is undetermined. </p>",
"isPaused": false,
"template": {
"title": "RFx - General Solicitation (for PURB departmental use: upload solicitation documents and required terms/sample contract/forms)"
},
"addendums": [
{
"id": 18230
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": null,
"created_at": "2023-04-12T14:44:11.445Z",
"department": {
"id": 1276,
"name": "Airports"
},
"government": {
"code": "saccounty",
"organization": {
"city": "Sacramento",
"logo": "https://assets.procurement.opengov.com/logo-uploads/bd0a409b-2085-409c-af36-57295175e712_SacCountyEbids_logo.png",
"name": "County of Sacramento",
"phone": "(916)876-6192",
"state": "CA",
"website": "https://dgs.saccounty.net/capsd/Pages/default.aspx",
"zipCode": "95827",
"address1": "9660 Ecology Lane",
"address2": null,
"phoneExt": null,
"timezone": "America/Los_Angeles",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "81676",
"closeOutReason": "RFQ Post-LOI Phase Initiated",
"closedSubstatus": "other",
"proposalDeadline": "2023-04-28T06:59:00.000Z",
"releaseProjectDate": "2023-04-20T07:00:00.000Z"
}