GovBidAlerts
← My Opportunities
closed🌐 pinellasfl26-0282-RFQ-CCNA

CHESNUT ASR & MAR SURFACE FACILITIES - ENGINEERING DESIGN, PERMTTING AND CONSTRUCTION OVERSIGHT

pinellasfl / UTILITIES

Description

The COUNTY wishes to proceed with design of surface facilities necessary to collect surface water, treat that water to meet regulatory requirements, and route water to the existing aquifer storage and recovery (ASR) and the managed aquifer recharge (MAR) well, with a potential bypass to directly feed the treated water to the North County Reclaimed Water System (NCRWS). Of note, construction of the MAR well will be ongoing during the beginning stages of this project and should completed in 2027.

Details

Posted
Feb 12, 2026
Response deadline
Mar 12, 2026, 7:00 PM UTC
Status
closed
Buyer
pinellasfl
Department
UTILITIES
Jurisdiction
pinellasfl
Reference #
26-0282-RFQ-CCNA
Summary
<p><span style="font-size: 11.0pt;">The COUNTY wishes to proceed with design of surface facilities necessary to collect surface water, treat that water to meet regulatory requirements, and route water
Is Paused
false
Template Title
Solicitation
Copy Count
0
Government Organization City
Clearwater
Government Organization Name
Pinellas County
Government Organization State
FL
Government Organization Website
http://www.pinellascounty.org/
Government Organization Zip Code
33765
Government Organization Address1
Pinellas County Courthouse Annex Bldg., Sixth Floor
Government Organization Address2
400 S. Ft. Harrison Ave.
Government Organization Timezone
America/New_York
Government Organization Country Code
US
Government Organization Phone Country
1
Close Out Reason
Cancelled per Utilities
Closed Substatus
canceled

Contact

(727)464-3311
Finding similar opportunities…

This listing is a summary from pinellasfl's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 234853,
  "_slug": "pinellasfl",
  "title": "CHESNUT ASR & MAR SURFACE FACILITIES - ENGINEERING DESIGN, PERMTTING AND CONSTRUCTION OVERSIGHT",
  "status": "closed",
  "summary": "<p><span style=\"font-size: 11.0pt;\">The COUNTY wishes to proceed with design of surface facilities necessary to collect surface water, treat that water to meet regulatory requirements, and route water to the existing aquifer storage and recovery (ASR) and the managed aquifer recharge (MAR) well, with a potential bypass to directly feed the treated water to the North County Reclaimed Water System (NCRWS). Of note, construction of the MAR well will be ongoing during the beginning stages of this project and should completed in 2027.</span></p>",
  "isPaused": false,
  "template": {
    "title": "Solicitation"
  },
  "addendums": [],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2026-02-04T21:03:02.571Z",
  "department": {
    "id": 2540,
    "name": "UTILITIES"
  },
  "government": {
    "code": "pinellasfl",
    "organization": {
      "city": "Clearwater",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/8fdb5763-d79b-4f9c-a0d9-f0650eaa84b8_PUR_Cnty_logo_RGB.png",
      "name": "Pinellas County",
      "phone": "(727)464-3311",
      "state": "FL",
      "website": "http://www.pinellascounty.org/",
      "zipCode": "33765",
      "address1": "Pinellas County Courthouse Annex Bldg., Sixth Floor",
      "address2": "400 S. Ft. Harrison Ave.",
      "phoneExt": null,
      "timezone": "America/New_York",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "26-0282-RFQ-CCNA",
  "closeOutReason": "Cancelled per Utilities",
  "closedSubstatus": "canceled",
  "proposalDeadline": "2026-03-12T19:00:37.965Z",
  "releaseProjectDate": "2026-02-12T19:31:02.380Z"
}