closed🌐 charlescountymd25-019
Mill Hill Road Improvements & Water Line Extension
charlescountymd / DPW Capital Project Mgt - Capital Services
Description
The County Commissioners of Charles County are seeking bids from qualified contractors for construction services on Mill Hill Road in Waldorf, MD. This Invitation to Bid (ITB) encompasses three distinct scopes: Mill Hill Road Improvements, Mill Hill Water Line Extension, and Mill Hill Overlay & Pavement Markings. Mill Hill Road Improvements Mill Hill Road Improvements begin at Davis Road and extending south to Devonfield Ave. The primary purpose is to construct and upgrade approximately 2,350 LF of existing roadway to a two-lane roadway that meets the current County Road Ordinance specifications and safety improvements. Upgrades of existing roadway will include, but are not limited to, road widening/reconstruction, roadway excavation and disposal, full-depth pavement sections, pavement grinding, asphalt overlay, pavement markings and signage, storm drain piping/structures, stormwater management facilities, curb and gutter, sidewalk, relocated utility poles (if necessary), tree clearing and grubbing, restoration and stabilization of all disturbed areas, landscaping, and other incidentals necessary to perform the work as described in this ITB solicitation package and identified on the permitted and/or associated contract drawings. All work must be in accordance with the applicable County, State, and Federal Specifications, and the approvals that govern the work items. The work for Mill Hill Road Improvements is covered by the following drawings: Mill Hill Road Improvements PGM VCI 05-008 Mill Hill Road Supplemental Drawings (these drawings coordinate the work between the road improvements and the water line extension) Mill Hill Water Line Extension Mill Hill Water Line Extension will interconnect neighborhoods and increase water system reliability. The water main extension runs along Mill Hill Road from Super Street to Devonfield Avenue and includes, but is not limited to, installation of approximately 1,282 LF of 12-inch diameter DIP, approximately 86 LF of 8-inch diameter DIP, and 6-inch diameter DIP for new and relocated/replaced fire hydrants. The scope also includes gate & hydrant shut-off valves, blowoff assemblies, tapping assemblies, bends, tees, plugs/caps, pipe restraints, thrust blocks, water house connections and associated corporation stops, curb stops (commercial), water meters, and other incidentals necessary to perform the work as described in this ITB solicitation package and identified on the permitted and/or associated contract drawings. All work must be in accordance with the applicable County, State, and Federal Specifications, and the approvals that govern the work items. The work for Mill Hill Water Lines Extension is covered by the following drawings: Mill Hill Road Water Main Extension PGM DSP-210037 Mill Hill Road Supplemental Drawings (these drawings coordinate the work between the road improvements and the water line extension) Mill Hill Overlay & Pavement Markings Mill Hill Road Overlay & Pavement Markings covers placement of 1-1/4” of surface course hot mix asphalt superpave along approximately 1,600 LF of existing roadway along Mill Hill Road, approximately 160 LF of existing roadway along Jay Street, and approximately 100 LF of existing roadway along Frances Street. Upon completion of the surface course, the contractor shall apply pavement markings according to the Mill Hill Road Sidewalk-SRTS drawings. All work must be in accordance with the applicable County, State, and Federal Specifications, and the approvals that govern the work items. The work for Mill Hill Overlay and Pavement Markings is covered by the following drawings: Mill Hill Road Overlay Scope Drawings (partial set highlighting the road segments designated for the overlay installation) Mill Hill Road Sidewalk SRTS PGM VCI 16-0021 - (full set, including applicable specifications and details for overlay and pavement markings) An Underdrain Report is also provided to all bidders to provide pertinent information.
Details?
- Posted
- Jan 14, 2025
- Response deadline
- Mar 6, 2025, 4:00 PM UTC
- Status
- closed
- Buyer
- charlescountymd
- Department
- DPW Capital Project Mgt - Capital Services
- Jurisdiction
- charlescountymd
- Reference #
- 25-019
- Summary
- <p style="margin-right: 0in; margin-left: 0in; font-size: 12pt;"><span style="font-size: 12px;"><span style="color: black;">The County Commissioners of Charles County are seeking bids from qualified c
- Is Paused
- false
- Template Title
- Invitation to Bid
- Copy Count
- 0
- Government Organization City
- La Plata
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/d7926fbf-37b4-4f49-91cd-a06fb4a4f6ee_County_of_Charles_Logo.png
- Government Organization Name
- Charles County Government
- Government Organization State
- MD
- Government Organization Website
- https://www.charlescountymd.gov/business/procurement-bid-opportunities
- Government Organization Zip Code
- 20646
- Government Organization Address1
- 200 Baltimore Street
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Closed Substatus
- awarded
Contact
(301)645-0656
Finding similar opportunities…
This listing is a summary from charlescountymd's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 137085,
"_slug": "charlescountymd",
"title": "Mill Hill Road Improvements & Water Line Extension",
"status": "closed",
"summary": "<p style=\"margin-right: 0in; margin-left: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"><span style=\"color: black;\">The County Commissioners of Charles County are seeking bids from qualified contractors for construction services on Mill Hill Road in Waldorf, MD. This</span> <span style=\"color: black;\">Invitation to Bid (ITB) encompasses three distinct scopes: Mill Hill Road Improvements, Mill Hill Water Line Extension, and Mill Hill Overlay & Pavement Markings.</span></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"><strong><span style=\"color: black;\">Mill Hill Road Improvements</span></strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px; color: black;\"> </span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"><span style=\"color: black;\">Mill Hill Road Improvements begin at Davis Road and extending south to Devonfield Ave. </span><span style=\"color: black;\">The primary purpose </span>is to construct and upgrade approximately 2,350 LF of existing roadway to a two-lane roadway that meets the current County Road Ordinance specifications and safety improvements. Upgrades of existing roadway will include, but are not limited to, road widening/reconstruction, roadway excavation and disposal, full-depth pavement sections, pavement grinding, asphalt overlay, pavement markings and signage, storm drain piping/structures, stormwater management facilities, curb and gutter, sidewalk, <span style=\"color: black;\">relocated utility poles (if necessary), tree clearing and grubbing, restoration and stabilization of all disturbed areas, landscaping, and other incidentals necessary to perform the work as described in this ITB solicitation package and identified on the permitted and/or associated contract drawings. All work must be in accordance with the applicable County, State, and Federal </span>Specifications, and the approvals that govern the work items. The work for Mill Hill Road Improvements is covered by the following drawings:</span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><ul style=\"margin-bottom: 0in; margin-top: 0px;\"><li style=\"text-align: justify; margin: 0in 0in 0in 0px; font-size: 12px;\"><span style=\"font-size: 12px;\">Mill Hill Road Improvements PGM VCI 05-008</span></li><li style=\"text-align: justify; margin: 0in 0in 0in 0px; font-size: 12px;\"><span style=\"font-size: 12px;\">Mill Hill Road Supplemental Drawings (these drawings coordinate the work between the road improvements and the water line extension)</span></li></ul><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"><strong>Mill Hill Water Line Extension</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\">Mill Hill Water Line Extension will interconnect neighborhoods and increase water system reliability. The water main extension runs along Mill Hill Road from Super Street to Devonfield Avenue and includes, but is not limited to, installation of approximately 1,282 LF of 12-inch diameter DIP, approximately 86 LF of 8-inch diameter DIP, and 6-inch diameter DIP for new and relocated/replaced fire hydrants. The scope also includes gate & hydrant shut-off valves, blowoff assemblies, tapping assemblies, bends, tees, plugs/caps, pipe restraints, thrust blocks, water house connections and associated corporation stops, curb stops (commercial), water meters, and other incidentals necessary to perform the work as described in this ITB solicitation package and identified on the permitted and/or associated contract drawings. All work must be in accordance with the applicable County, State, and Federal Specifications, and the approvals that govern the work items. The work for Mill Hill Water Lines Extension is covered by the following drawings:</span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><ul style=\"margin-bottom: 0in; margin-top: 0px;\"><li style=\"text-align: justify; margin: 0in 0in 0in 0px; font-size: 12px;\"><span style=\"font-size: 12px;\">Mill Hill Road Water Main Extension PGM DSP-210037</span></li></ul><ul style=\"margin-bottom: 0in; margin-top: 0px;\"><li style=\"text-align: justify; margin: 0in 0in 0in 0px; font-size: 12px;\"><span style=\"font-size: 12px;\">Mill Hill Road Supplemental Drawings (these drawings coordinate the work between the road improvements and the water line extension)</span></li></ul><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"><a name=\"_Hlk183861728\"></a><strong>Mill Hill Overlay & Pavement Markings</strong></span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\">Mill Hill Road Overlay & Pavement Markings covers placement of 1-1/4” of surface course hot mix asphalt superpave along approximately 1,600 LF of existing roadway along Mill Hill Road, approximately 160 LF of existing roadway along Jay Street, and approximately 100 LF of existing roadway along Frances Street. Upon completion of the surface course, the contractor shall apply pavement markings according to the Mill Hill Road Sidewalk-SRTS drawings. <span style=\"color: black;\">All work must be in accordance with the applicable County, State, and Federal </span>Specifications, and the approvals that govern the work items. The work for Mill Hill Overlay and Pavement Markings is covered by the following drawings:</span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><ul style=\"margin-bottom: 0in; margin-top: 0px;\"><li style=\"text-align: justify; margin: 0in 0in 0in 0px; font-size: 12px;\"><span style=\"font-size: 12px;\">Mill Hill Road Overlay Scope Drawings (partial set highlighting the road segments designated for the overlay installation)</span></li><li style=\"text-align: justify; margin: 0in 0in 0in 0px; font-size: 12px;\"><span style=\"font-size: 12px;\">Mill Hill Road Sidewalk SRTS PGM VCI 16-0021 - (full set, including applicable specifications and details for overlay and pavement markings)</span></li></ul><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\"> </span></p><p style=\"margin: 0in; font-size: 12pt;\"><span style=\"font-size: 12px;\">An Underdrain Report is also provided to all bidders to provide pertinent information.</span></p>",
"isPaused": false,
"template": {
"title": "Invitation to Bid"
},
"addendums": [
{
"id": 65705
},
{
"id": 66211
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2024-12-18T19:31:20.450Z",
"department": {
"id": 3749,
"name": "DPW Capital Project Mgt - Capital Services"
},
"government": {
"code": "charlescountymd",
"organization": {
"city": "La Plata",
"logo": "https://assets.procurement.opengov.com/logo-uploads/d7926fbf-37b4-4f49-91cd-a06fb4a4f6ee_County_of_Charles_Logo.png",
"name": "Charles County Government",
"phone": "(301)645-0656",
"state": "MD",
"website": "https://www.charlescountymd.gov/business/procurement-bid-opportunities",
"zipCode": "20646",
"address1": "200 Baltimore Street",
"address2": null,
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "25-019",
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2025-03-06T16:00:16.581Z",
"releaseProjectDate": "2025-01-14T17:17:50.713Z"
}