GovBidAlerts
← My Opportunities
closed🌐 rtd-denverIFB 323DH027

14th and California Rail Crossing Rehabilitation and Reconstruction (15% SBE Goal)

rtd-denver / Rail Operations

Description

The Contractor shall be responsible for the RTD Light Rail rehabilitation and reconstruction at 14th and California. The work includes the removal of track, track paving, ties, ballast, and concrete pavement, and reconstruction of the track section including excavating to the existing sub-ballast, placing new geotextile fabric, new ballast, and concrete ties, setting new 115 RE rail, e-clips and flangeway filler and casting new concrete embedded trackway paving. For this contract, RTD has specified an SBE goal of fifteen percent (15%) for the work to be performed.

Details

Posted
Jun 13, 2023
Response deadline
Jul 20, 2023, 8:00 PM UTC
Status
closed
Buyer
rtd-denver
Department
Rail Operations
Jurisdiction
rtd-denver
Reference #
IFB 323DH027
Summary
<p>The Contractor shall be responsible for the RTD Light Rail rehabilitation and reconstruction at 14th and California. The work includes the removal of track, track paving, ties, ballast, and concret
Is Paused
false
Template Title
Attach your Solicitation (use for publishing solicitations that have been developed outside of the system)
Copy Count
0
Government Organization City
Denver
Government Organization Name
Regional Transportation District
Government Organization State
CO
Government Organization Website
https://www.rtd-denver.com/business-center
Government Organization Zip Code
80202
Government Organization Address1
1660 Blake Street
Government Organization Timezone
America/Denver
Government Organization Country Code
US
Government Organization Phone Country
1
Closed Substatus
awarded

Contact

(303)299-2251
Finding similar opportunities…

This listing is a summary from rtd-denver's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 49110,
  "_slug": "rtd-denver",
  "title": "14th and California Rail Crossing Rehabilitation and Reconstruction (15% SBE Goal)",
  "status": "closed",
  "summary": "<p>The Contractor shall be responsible for the RTD Light Rail rehabilitation and reconstruction at 14th and California. The work includes the removal of track, track paving, ties, ballast, and concrete pavement, and reconstruction of the track section including excavating to the existing sub-ballast, placing new geotextile fabric, new ballast, and concrete ties, setting new 115 RE rail, e-clips and flangeway filler and casting new concrete embedded trackway paving. For this contract, RTD has specified an SBE goal of fifteen percent (15%) for the work to be performed.</p>",
  "isPaused": false,
  "template": {
    "title": "Attach your Solicitation (use for publishing solicitations that have been developed outside of the system)"
  },
  "addendums": [
    {
      "id": 21452
    },
    {
      "id": 21321
    }
  ],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2023-06-01T16:47:01.917Z",
  "department": {
    "id": 3047,
    "name": "Rail Operations"
  },
  "government": {
    "code": "rtd-denver",
    "organization": {
      "city": "Denver",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/727784b4-2c21-40c2-b4e5-9ecd2fb3f9a3_RTD_logo_cmyk_c_red_(1)_(002).png",
      "name": "Regional Transportation District",
      "phone": "(303)299-2251",
      "state": "CO",
      "website": "https://www.rtd-denver.com/business-center",
      "zipCode": "80202",
      "address1": "1660 Blake Street",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Denver",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "IFB 323DH027",
  "closeOutReason": null,
  "closedSubstatus": "awarded",
  "proposalDeadline": "2023-07-20T20:00:00.000Z",
  "releaseProjectDate": "2023-06-13T19:29:24.656Z"
}