Solar Photovoltaics, Battery Energy Storage System, and Microgrid Facility Installation: Request for Information

mtsac / Facilities, Planning and Management

Description

Project Description: In March of 2024, a Solar Feasibility Study was completed for Mount San Antonio Community College (Mt. SAC) for the potential development of a solar photovoltaic (PV) electric generating and Battery Energy Storage System (BESS) facility to offset the cost of electricity associated with the operation of the college, located at 1100 N Grand Ave, Walnut, CA 91789. This Solar Feasibility Study evaluated feasibility to install a behind-the-meter (BTM) solar PV system, battery energy storage system, and campus micro-grid facility right-sized based on projected load-growth scenarios to assist Mt. SAC in upgrading on-site distributed energy resources (DER) that can pair with existing campus infrastructure and Thermal Energy Storage (TES). DERs will provide generation and storage to offset some the college’s on-site energy needs and allow the campus to have more control and flexibility over when grid-sourced energy is used. The study determined that the best performance and value were found when were batteries sized at 3.2 MW/6.4 MWh and solar PV was sized at 6.75 MW installed across Lot F and Lot B (see Section 4: Preliminary Solar PV Installation Options, Case C in the Solar Feasibility Report for additional information). Mt. SAC is now issuing a Request for Information (RFI) seeking insight from potential vendors into the resources and support needed to ensure successful installation of a solar PV, BESS, and microgrid system that meets the appropriate parameters as determined by the study. This RFI does NOT bind Mt. SAC to any action or agreement. Additionally, submitting a response to this RFI shall neither preclude nor pre-qualify any firm from participating under the eventual RFP.

Details

Posted
Oct 21, 2024
Response deadline
Nov 23, 2024, 1:00 AM UTC
Status
closed
Buyer
mtsac
Department
Facilities, Planning and Management
Jurisdiction
mtsac
Reference #
2024-135
Summary
<p>Project Description:</p><p>In March of 2024, a Solar Feasibility Study was completed for Mount San Antonio Community College (Mt. SAC) for the potential development of a solar photovoltaic (PV) ele
Is Paused
false
Template Title
Request for Information
Copy Count
0
Government Organization City
Walnut
Government Organization Name
Mt. San Antonio College
Government Organization State
CA
Government Organization Website
https://www.mtsac.edu/purchasing/index.html
Government Organization Zip Code
91789
Government Organization Address1
1100 N. Grand Ave.
Government Organization Timezone
America/Los_Angeles
Government Organization Country Code
US
Government Organization Phone Country
1
Close Out Reason
No vendor selected

Contact

(909)274-4245
Finding similar opportunities…

This listing is a summary from mtsac's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": 106882,
  "_slug": "mtsac",
  "title": "Solar Photovoltaics, Battery Energy Storage System, and Microgrid Facility Installation: Request for Information",
  "status": "closed",
  "summary": "<p>Project Description:</p><p>In March of 2024, a Solar Feasibility Study was completed for Mount San Antonio Community College (Mt. SAC) for the potential development of a solar photovoltaic (PV) electric generating and Battery Energy Storage System (BESS) facility to offset the cost of electricity associated with the operation of the college, located at 1100 N Grand Ave, Walnut, CA 91789.</p><p>This Solar Feasibility Study evaluated feasibility to install a behind-the-meter (BTM) solar PV system, battery energy storage system, and campus micro-grid facility right-sized based on projected load-growth scenarios to assist Mt. SAC in upgrading on-site distributed energy resources (DER) that can pair with existing campus infrastructure and Thermal Energy Storage (TES). DERs will provide generation and storage to offset some the college&rsquo;s on-site energy needs and allow the campus to have more control and flexibility over when grid-sourced energy is used.</p><p>The study determined that the best performance and value were found when were batteries sized at 3.2 MW/6.4 MWh and solar PV was sized at 6.75 MW installed across Lot F and Lot B (see Section 4: Preliminary Solar PV Installation Options, Case C in the Solar Feasibility Report for additional information). Mt. SAC is now issuing a Request for Information (RFI) seeking insight from potential vendors into the resources and support needed to ensure successful installation of a solar PV, BESS, and microgrid system that meets the appropriate parameters as determined by the study.</p><p>This RFI does NOT bind Mt. SAC to any action or agreement.</p><p>Additionally, submitting a response to this RFI shall neither preclude nor pre-qualify any firm from participating under the eventual RFP.</p><p>&nbsp;</p>",
  "isPaused": false,
  "template": {
    "title": "Request for Information"
  },
  "addendums": [],
  "copyCount": 0,
  "isPrivate": false,
  "comingSoon": false,
  "created_at": "2024-07-23T21:15:58.804Z",
  "department": {
    "id": 3055,
    "name": "Facilities, Planning and Management"
  },
  "government": {
    "code": "mtsac",
    "organization": {
      "city": "Walnut",
      "logo": "https://assets.procurement.opengov.com/logo-uploads/ef03dfbd-6476-45e8-a64c-0a8c2af6cc0c_logo_for_mt_sac.jpg",
      "name": "Mt. San Antonio College",
      "phone": "(909)274-4245",
      "state": "CA",
      "website": "https://www.mtsac.edu/purchasing/index.html",
      "zipCode": "91789",
      "address1": "1100 N. Grand Ave.",
      "address2": null,
      "phoneExt": null,
      "timezone": "America/Los_Angeles",
      "countryCode": "US",
      "phoneCountry": "1"
    }
  },
  "financialId": "2024-135",
  "closeOutReason": "No vendor selected",
  "closedSubstatus": "no vendor selected",
  "proposalDeadline": "2024-11-23T01:00:00.000Z",
  "releaseProjectDate": "2024-10-21T15:16:55.466Z"
}