closed🌐 mtsac2024-135
Solar Photovoltaics, Battery Energy Storage System, and Microgrid Facility Installation: Request for Information
mtsac / Facilities, Planning and Management
Description
Project Description: In March of 2024, a Solar Feasibility Study was completed for Mount San Antonio Community College (Mt. SAC) for the potential development of a solar photovoltaic (PV) electric generating and Battery Energy Storage System (BESS) facility to offset the cost of electricity associated with the operation of the college, located at 1100 N Grand Ave, Walnut, CA 91789. This Solar Feasibility Study evaluated feasibility to install a behind-the-meter (BTM) solar PV system, battery energy storage system, and campus micro-grid facility right-sized based on projected load-growth scenarios to assist Mt. SAC in upgrading on-site distributed energy resources (DER) that can pair with existing campus infrastructure and Thermal Energy Storage (TES). DERs will provide generation and storage to offset some the college’s on-site energy needs and allow the campus to have more control and flexibility over when grid-sourced energy is used. The study determined that the best performance and value were found when were batteries sized at 3.2 MW/6.4 MWh and solar PV was sized at 6.75 MW installed across Lot F and Lot B (see Section 4: Preliminary Solar PV Installation Options, Case C in the Solar Feasibility Report for additional information). Mt. SAC is now issuing a Request for Information (RFI) seeking insight from potential vendors into the resources and support needed to ensure successful installation of a solar PV, BESS, and microgrid system that meets the appropriate parameters as determined by the study. This RFI does NOT bind Mt. SAC to any action or agreement. Additionally, submitting a response to this RFI shall neither preclude nor pre-qualify any firm from participating under the eventual RFP.
Details?
- Posted
- Oct 21, 2024
- Response deadline
- Nov 23, 2024, 1:00 AM UTC
- Status
- closed
- Buyer
- mtsac
- Department
- Facilities, Planning and Management
- Jurisdiction
- mtsac
- Reference #
- 2024-135
- Summary
- <p>Project Description:</p><p>In March of 2024, a Solar Feasibility Study was completed for Mount San Antonio Community College (Mt. SAC) for the potential development of a solar photovoltaic (PV) ele
- Is Paused
- false
- Template Title
- Request for Information
- Copy Count
- 0
- Government Organization City
- Walnut
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/ef03dfbd-6476-45e8-a64c-0a8c2af6cc0c_logo_for_mt_sac.jpg
- Government Organization Name
- Mt. San Antonio College
- Government Organization State
- CA
- Government Organization Website
- https://www.mtsac.edu/purchasing/index.html
- Government Organization Zip Code
- 91789
- Government Organization Address1
- 1100 N. Grand Ave.
- Government Organization Timezone
- America/Los_Angeles
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Close Out Reason
- No vendor selected
Contact
(909)274-4245
Finding similar opportunities…
This listing is a summary from mtsac's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 106882,
"_slug": "mtsac",
"title": "Solar Photovoltaics, Battery Energy Storage System, and Microgrid Facility Installation: Request for Information",
"status": "closed",
"summary": "<p>Project Description:</p><p>In March of 2024, a Solar Feasibility Study was completed for Mount San Antonio Community College (Mt. SAC) for the potential development of a solar photovoltaic (PV) electric generating and Battery Energy Storage System (BESS) facility to offset the cost of electricity associated with the operation of the college, located at 1100 N Grand Ave, Walnut, CA 91789.</p><p>This Solar Feasibility Study evaluated feasibility to install a behind-the-meter (BTM) solar PV system, battery energy storage system, and campus micro-grid facility right-sized based on projected load-growth scenarios to assist Mt. SAC in upgrading on-site distributed energy resources (DER) that can pair with existing campus infrastructure and Thermal Energy Storage (TES). DERs will provide generation and storage to offset some the college’s on-site energy needs and allow the campus to have more control and flexibility over when grid-sourced energy is used.</p><p>The study determined that the best performance and value were found when were batteries sized at 3.2 MW/6.4 MWh and solar PV was sized at 6.75 MW installed across Lot F and Lot B (see Section 4: Preliminary Solar PV Installation Options, Case C in the Solar Feasibility Report for additional information). Mt. SAC is now issuing a Request for Information (RFI) seeking insight from potential vendors into the resources and support needed to ensure successful installation of a solar PV, BESS, and microgrid system that meets the appropriate parameters as determined by the study.</p><p>This RFI does NOT bind Mt. SAC to any action or agreement.</p><p>Additionally, submitting a response to this RFI shall neither preclude nor pre-qualify any firm from participating under the eventual RFP.</p><p> </p>",
"isPaused": false,
"template": {
"title": "Request for Information"
},
"addendums": [],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2024-07-23T21:15:58.804Z",
"department": {
"id": 3055,
"name": "Facilities, Planning and Management"
},
"government": {
"code": "mtsac",
"organization": {
"city": "Walnut",
"logo": "https://assets.procurement.opengov.com/logo-uploads/ef03dfbd-6476-45e8-a64c-0a8c2af6cc0c_logo_for_mt_sac.jpg",
"name": "Mt. San Antonio College",
"phone": "(909)274-4245",
"state": "CA",
"website": "https://www.mtsac.edu/purchasing/index.html",
"zipCode": "91789",
"address1": "1100 N. Grand Ave.",
"address2": null,
"phoneExt": null,
"timezone": "America/Los_Angeles",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "2024-135",
"closeOutReason": "No vendor selected",
"closedSubstatus": "no vendor selected",
"proposalDeadline": "2024-11-23T01:00:00.000Z",
"releaseProjectDate": "2024-10-21T15:16:55.466Z"
}