IFBclosed🌐 Virginia (eVA)12-720
Library HVAC Upgrades
City of Lynchburg
Description
ARRA Project includes demolition and replacement of the existing AHUs and condensers with new AHUs and Heat Pump Condensers, demolition adn disposal of existing boiler, pumps, and associated pipes and coils, and coordination of the existing controls with the new building HVAC equipment. Also includes the demolition and replacement of the MCC panel in the mechanical room and lighting upgrades in the Jones Memorial Library.
Details?
- Posted
- Sep 15, 2011
- Response deadline
- Oct 5, 2011, 3:00 PM UTC
- Type
- IFB
- Category
- Construction
- Status
- closed
- Buyer
- City of Lynchburg
- Jurisdiction
- Virginia (eVA)
- Location
- Lynchburg Public Library and Jones Memorial Library, Lynchburg, VA
- Reference #
- 12-720
- App
- VBO
- Agency
- LAA5
- Doctype
- SO
- Version
- 1
- Commcode
- 91017, 91450
- Commdesc
- Energy Computerized Control System (HVAC, Lighting, Utilities, etc) Installation, Maintenance and Repair Services,Heating, Ventilating and Air Conditioning (HVAC)
- Longdesc
- ARRA Project includes demolition and replacement of the existing AHUs and condensers with new AHUs and Heat Pump Condensers, demolition adn disposal of existing boiler, pumps, and associated pipes and
- Doccddesc
- Invitation for Bids (IFB)
- Commlinedesc
- []
- Lastupdatedate
- Oct 13, 2018
Contact
Stephanie Suter
Finding similar opportunities…
This listing is a summary from Virginia (eVA)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": "VBO:IFB:LAA5:72807",
"app": "VBO",
"doccd": "IFB",
"agency": "LAA5",
"status": "Closed",
"doctype": "SO",
"pubdate": "2011-09-15T16:00:00Z",
"version": "1",
"workloc": "Lynchburg Public Library and Jones Memorial Library, Lynchburg, VA",
"category": "Construction",
"commcode": [
"91017, 91450"
],
"commdesc": [
"Energy Computerized Control System (HVAC, Lighting, Utilities, etc) Installation, Maintenance and Repair Services,Heating, Ventilating and Air Conditioning (HVAC)"
],
"longdesc": "ARRA Project includes demolition and replacement of the existing AHUs and condensers with new AHUs and Heat Pump Condensers, demolition adn disposal of existing boiler, pumps, and associated pipes and coils, and coordination of the existing controls with the new building HVAC equipment. Also includes the demolition and replacement of the MCC panel in the mechanical room and lighting upgrades in the Jones Memorial Library.",
"_version_": 1747861004854755300,
"buyername": "Stephanie Suter",
"closedate": "2011-10-05T15:00:00Z",
"doccddesc": "Invitation for Bids (IFB)",
"docdeptcd": "LAA5",
"shortdesc": "Library HVAC Upgrades",
"agencyname": "City of Lynchburg",
"externalid": "12-720",
"internalid": "72807",
"commlinedesc": [
"[]"
],
"lastupdatedate": "2018-10-13T03:05:37Z",
"categoryshortdesc": "Construction",
"openresponsesdate": "2011-10-05T15:00:00Z"
}