Kumson Yi
kumson.yi.civ@army.mil · 27 awards · $8,875,159 total
- Purchase and Warranty Support for 1,620 Dehumidifiers for Soldiers Barracks, Area IV, USAG DaeguDEPT OF DEFENSE / DEPT OF THE ARMY → SUP-A CO., LTD. 136,SURE-RO 964BEON-GIL, HWADO-EUP NAMYANGJU-SIprimaryW90VN926PA026$443,466—
- Repair Failed or Failing Bldg 577 (Barracks) at Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → SAM A CONSTRUCTION CO., LTD 6TH FLOOR, 246 ICHEON-RO, JUNG-GU DAEGUprimaryW91QVN24D0051$1,416,962—
- Repave Concrete at Bldg 938, Camp CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$835,209—
- Purchase and Warranty Support for 1,800 Dehumidifiers for Soldiers Barracks, Area IV, USAG DaeguDEPT OF DEFENSE / DEPT OF THE ARMY → FINELOGIX CO.,LTD. 222, GONGHANG-DAERO GANGSEO-GU SEOULprimaryW90VN926PA018$557,574—
- Fan Coil Unit Cleaning Services for 18 Barracks, Area IV, USAG DaeguDEPT OF DEFENSE / DEPT OF THE ARMY → NAMBU SERVICE CO., LTD. 37 SINWOL-GIL, AMNYANG-EUP GYEONGSAN 38540primaryW90VN926PA017$200,982—
- Repair the Failing Humidity Control Equipment at Bldg 836, Camp CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → LK CONSTRUCTION CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SIprimaryW91QVN24D0081$1,008,533—
- Replace Carpet at Chapel, Bldg 260, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → LK CONSTRUCTION CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SIprimaryW91QVN24D0081$42,502—
- BPA WOODEN FURNITURE REPAIR FOR AREA IVDEPT OF DEFENSE / DEPT OF THE ARMY → LIFURS 66 JUSEOK-RO 184BEON-GIL NAMYANG-EUP HWASEONG-SI 18255primaryW90VN926AA002$0—
- Conveyor System Purchase, Installation and Warranty Services at MMT, BusanDEPT OF DEFENSE / DEPT OF THE ARMY → KOTRACK INCORPORATED 59 SEOJEONGBUK-RO PYEONGTAEK-SIprimaryW90VN926PA007$136,080—
- (MATOC) Connect tepid water for the emergency overhead and eyewash stations at B732,733, Camp CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → ELRIM CONSTRUCTION CO., LTD. 33-9, ARISU-RO 93-GIL, GANGDONG-GU SEOUL 05211primaryW91QVN24D0042$29,674—
- New Parking Spaces Near Bldg 574, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → Youngjin Construction Inc. 59-12 DONGMYEONGPALGEOCHEON 3-GIL, DONGMYEONG-MYEON CHILGOK-GUNprimaryW91QVN24D0057$79,896—
- Remove Abandoned Fuel Lines, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → LK TECH CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SIprimaryW91QVN24D0081$48,699—
- Repair failed and malfunctioning helipad lighting control system and broken field lights at Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$100,973—
- REPAIR FAILED OR FAILING THE ROOF AND THE ROLL UP DOORS AT BLDG 200 (CAR CARE CENTER), CAMP WALKERDEPT OF DEFENSE / DEPT OF THE ARMY → YIBON Construction Co., Ltd. 81, WANGSAN-RO DONGDAEMUN-GU SEOULprimaryW91QVN24D0056$281,168—
- Install Backup Boiler for Bldg 830, Camp Walker (Project No. JA-00045-4J)DEPT OF DEFENSE / DEPT OF THE ARMY → SEOJIN CONSTRUCTION CO.,LTD 13 YONGJI-RO 169BEON-GIL SEONGSAN-GU CHANGWON-SI 51436primaryW91QVN24D0052$167,401—
- (MATOC) Repair Failed Building 5201 at FOS CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → YIBON Construction Co., Ltd. 81, WANGSAN-RO DONGDAEMUN-GU SEOULprimaryW91QVN24D0056$254,819—
- Inspection of Aboveground Fuel Storage Tanks at B217 at Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → DONGJIN CONSTRUCTION CO., LTD. 1, GEUMAM 2-GIL, DONGMYEONG-MYEON CHILGOK-GUN 39859primaryW91QVN24D0040$60,738—
- Maintenance, Repair and Testing for Vertical Transportation Equipment (VTE) for Navy ChinhaeDEPT OF DEFENSE / DEPT OF THE ARMY → DAEMYUNG ELEVATOR CO., LTD. 19, HWALBAM-RO, BUK-GU ULSANprimaryW90VN925DA018$411,229—
- (MATOC) Repair Failed or Failing AC System at Bldg 985 (Warehouse), Camp CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → LK TECH CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SIprimaryW91QVN24D0081$106,148—
- (MATOC) Repair Failed or Failing Elevated Water Tank at Pier #8DEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$181,402Jun 4, 2025
- Replace Leaking Water Pipelines for HVAC system, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$258,711May 29, 2025
- Replace Leaking Water Pipelines for HVAC system, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$258,711May 29, 2025
- Replace Leaking Water Pipelines for HVAC system, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$258,711May 29, 2025
- Replace Leaking Water Pipelines for HVAC system, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$258,710May 29, 2025
- Replace Leaking Water Pipelines for HVAC system, Camp WalkerDEPT OF DEFENSE / DEPT OF THE ARMY → YEAJIN E&C CO.,Ltd. 1F, 271, APSANSUNHWAN-RO, DALSEO-GU DAEGU 42819primaryW91QVN24D0110$258,711May 29, 2025
- Repair the failing humidity control equipment at Bldg 837, Camp CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → HANBAEK CONSTRUCTION CO.,LTD 526 HYEOKSIN-RO, DEOKJIN-GU JEONJU-SI 54856primaryW91QVN24D0044$1,130,480May 29, 2025
- Install fire alarm and kitchen fire suppression system at B382, Camp CarrollDEPT OF DEFENSE / DEPT OF THE ARMY → SORI E&C CO.,LTD 150, SEONYEON-GIL OKSEO-MYEON GUNSAN-SIprimaryW91QVN24D0055$87,670May 28, 2025